Frequently Asked Questions
? What is included in the prices you give📌
Preparation and assembly of prefabricated housing materials. Preparation of painting materials and painting. Preparation and assembly of windows, interior doors and exterior doors. Preparation and assembly of electrical and water installation materials.
? What needs to be done by the customer📌
Floor concrete and all kinds of excavation work, floor and wall coverings (cement, ceramic, parquet, tiles, etc.), making external connections outside the prefabricated building (electricity, wastewater, clean water), permits and licenses to be obtained from the municipality, heating and cooling installations (heater, air conditioning, etc.), food and accommodation expenses of the assembly team, transportation and transportation insurance are the responsibility of our customer.
? Can you make prefabricated housing everywhere in Turkey📌
We provide service to every region of Turkey. The buyer covers the food and accommodation expenses of the assembly and painting teams. (Assembly team consists of 5 people, Painting team consists of 2 people.)
? Is a license required for the construction of prefabricated houses📌
The license is at the initiative of the municipality in the region where the prefabricated house will be built. In order to obtain a license, it is the customer's responsibility to have the architectural, static, mechanical and electrical project prepared by the architectural offices. The license and all other legal permissions are the responsibility of our customer.
? How is the heat and sound insulation of prefabricated houses📌
The outer wall thickness we use in prefabricated houses is 10 cm. The 8 cm thick 16 kg/m3 density styrofoam between the wall panels and the 10 cm mineral wool used for roof insulation provide much more heat and sound insulation than a normal reinforced concrete building.
? How long is the life of prefabricated houses📌
The wall materials used in prefabricated houses are Betopan & Fibercement. The building carrier system and all metal parts in contact with the outside nature are galvanized and rust is delayed. The average lifespan of prefabricated houses is between 45-50 years.
? Are prefabricated houses only for summer purposes📌
Prefabricated houses are equipped with an insulation system that will allow use in all seasons. Buildings suitable for all climate conditions can be produced. Production can be carried out by taking into account the climate characteristics of the place where the structures will be built.
? How many floors can prefabricated houses be built at most📌
They can be built as single-storey or double-storey.
? Can they be built on a reinforced concrete building📌
They can only be built on single-storey reinforced concrete buildings. The building below must have a solid and flat ceiling.
? Can a building be built with the plan and exterior appearance we want📌
As long as it is compatible with the prefabricated construction system, the appearance and plan you want can be made.
? In how many days is a prefabricated house delivered on average📌
Depending on the square meter of the prefabricated house you have chosen and the factory density, an average 100 m2 single-storey house is delivered in 15-20 business days. The assembly is completed in an average of 7 days and the painting is completed in 3 days.
? Which vehicles can be used to transport prefabricated houses📌
The transportation of prefabricated houses can be done by truck, TIR, ship or train. An average 7-meter wooden box truck can take 70m2 of prefabricated building material. The average total weight varies between 7-8 tons.
? Are prefabricated houses earthquake resistant📌
It should not be forgotten that prefabricated houses emerged as earthquake houses. Since they are much lighter than a reinforced concrete building and the disassembled parts are connected with steel screws, they flex during an earthquake but do not collapse.
? Can prefabricated houses be dismantled and reassembled in a different place📌
You can have your houses dismantled and reassembled in a different place at any time, provided that the dismantling cost and reassembly costs are paid.
? What is your payment method📌
80% of the contract price is collected in cash as of the contract date. The remaining 20% is collected in cash at the time of loading.
? Where can we see the constructed buildings📌
You can see them at our showroom address in Izmir. Get Directions